We have finished work on the manufacture of a bungalow (as well as the foundations, construction, landscaping, fencing and pathway) – the first we have been contracted for in London.
Our new building replaces an existing prefabricated dwelling, originally put up just after the war in the 1940′s, and recently damaged by fire.
As you can imagine, there have been many developments in modular building design and technology since the original was installed, and our brief was to keep as near as possible to the original buildings appearance as possible, but to adhere to all the new Building Regulations especially with regard to insulation properties etc.
The new building is now located within an existing estate of 1940′s prefabs, and is the first of several more, as the old buildings get updated.
